1. <tt id="cjm1j"></tt>

    2. <cite id="cjm1j"><rp id="cjm1j"><delect id="cjm1j"></delect></rp></cite>
        <cite id="cjm1j"></cite>

        1. 亚洲中文无码字幕,中文字幕av久久爽一区,色就是色3751,国产精品成人网,伊人无码网,影音先锋av中文字幕,中文字幕人妻精品免费,欧洲高清无码
          Adjustment Steps Needed to Know for Electrical Transformation of Cold Heading Opportunity

          Current location:Home  / News  / Industry information / Adjustment Steps Needed to Know for Electrical Transformation of Cold Heading Opportunity

          Adjustment Steps Needed to Know for Electrical Transformation of Cold Heading Opportunity

          date:[2016-07-11]     pk_hits:

          The electrical transformation of cold heading machine needs to be adjusted properly: the electrical transformation of cold heading machine needs to achieve the following steps: hardware field connection, parameter setting, processing test, emergency stop and hold, reset and key protection.

          If the cold heading machine has defects during operation, it needs to be electrically modified. How can the electrical modification of the cold heading machine be used?

          First of all, it should be analyzed that the adjustment and operation of the cold heading machine may be due to the problem of setting. The adjustment steps can be seen from the analysis of the adjustment and operation of the cold heading machine.

          1. Hardware field connection. Install the proximity switch on the equipment and connect all components according to the electrical schematic diagram.

          2. Parameter setting. According to the requirements of the user unit, set the acceleration and deceleration time parameter (2202) to set the time required for raising the frequency converter starting frequency from 1Hz to 50Hz (that is, the motor speed from 0r/min to 1500r/min) as 3s. Wuxi website optimization

          3. Processing test. First, start the equipment to process parts in the manual mode, and change the operation of the equipment to the automatic mode correctly. Set the total number of processed parts on the counter to 30 pieces and start the equipment when the number of processed parts reaches 30 pieces. In the manual and automatic modes, the processing speed of the parts of the rotary speed regulating potentiometer changes accordingly, and the speed in different periods is displayed on the digital display. 4. Emergency stop and hold. Press the emergency stop button on the operation panel of the control cabinet to stop the equipment. Pull off the data on the total power counter and keep it unchanged. After power transmission is restarted, the equipment continues to process parts until the preset number is reached. http://www.wxwangzhan.cn

          5. Reset. Press the two reset switches on the counter operation panel to reset the preset number and processing number respectively.

          6. Key protection. After turning the key switch (SA1), the key operation on the counter operation panel is invalid. After 6 months of operation, the equipment is in good condition and all technical parameters have met the requirements of the user unit.

          After the completion of the electrical transformation of the cold heading machine, the functions of the cold heading machine will be strengthened and expanded. A programmable logic controller (PLC) can be further added to the system to realize the automatic control of the processing process by adding signal input points and programming.


          Pingyang Tianwei Machinery Co., LtdFull system solutions for quality machinery manufacturers

          All product pictures and publicity pictures of this website belong to us. No individual or organization is allowed to use them, and any embezzlement must be prosecuted.

          Pingyang Tianwei Machinery Co., Ltd

          Tel:0577-86266681Tel:0577-86125986mobile phone:13806699071E-mail:tianweimachine@126.comAdd: Haixi Industrial Park, Pingyang County, Wenzhou, Zhejiang

          WeChat

          Service hotline

          13806699071

          We warmly welcome your consultation, and we will provide you with satisfactory mechanical solutions

          主站蜘蛛池模板: 少妇被多人c夜夜爽爽| 风韵丰满熟妇啪啪区老熟熟女| 亚洲中文字幕久在线| 中文无码一区二区不卡av| 99久久国产综合精品成人影院| 亚洲欧美视频| 人妻系列中文| 精品国产乱| 最近免费中文字幕大全免费版视频 | 产综合无码一区| 五月婷视频| 国产3p视频| 亚洲国产日韩欧美一区二区三区| 毛片一区二区三区无码| 久久香综合精品久久伊人| 国产中文字幕在线一区| 岛国av一区二区精品| 原平市| 国产精品欧美亚洲韩国日本久久| 国产精品国产三级在线专区| 亚洲精品字幕| 国产欧美日韩精品第二区| 鲁鲁AV| 欧美成人免费一区二区三区视频 | 亚洲欧美?va天堂人熟伦| 沅江市| 国产无遮挡18禁网站免费| 国产首页一区二区不卡| 久久亚洲综合色| 精品国产免费一区二区三区香蕉| 亚洲乱亚洲乱妇24p| 日本熟妇浓毛| 国产真实的和子乱拍在线观看| jizzjizz欧美| 少妇人妻偷人精品视蜜桃| 四虎库影成人在线播放| 人妻人人爽| 18禁免费无码无遮挡不卡网站| 人妻中文字幕在线视频无码| 亚洲欧美综合精品成| 罗定市|